Industrial
PULAU PUNGGOL TIMOR AGGREGATE TERMINAL (PPAT)
Supply and Install 15m high wall cladding and its steel structure frame for around 1750 meter length in total.
Mega Yard
Project consist erection of 8 numbers of various size of Workshops, Warehouse and Ancillary Buildings for Shipyard Development (Phase 1) at new expanded land in Tuas south area. The total tonnage for this project is approximately 4,300 tons of structural steel.
Admiralty Road West
Project comprise fabrication and erection Of new Workshops to Existing Workshop at Admiralty Road West which owned by Sembawang Shipyard. The project tonnage consist of 518 tons.
Shipyard Crescent
The project consists of supply, fabrication and erection of 22m W x 15m L x 15m H movable shelter for Jurong Shipyard at 60 Shipyard Crescent. The project included a total of 71 tons of structural steel.
Ban Yan Ave
Project is owned by Tembusu Multi-Utilities Complex and the work scope is erection of 3 nos of pipe rack bridges which the longest bridge is 121.7m in length and other miscellaneous metal work, and the work site is located at Banyan Drive, Tembusu Drive and Banyan Avenue. The project was utilized a total of 730 tons of structural steel for pipe rack system.
KulaiJaya
The project consists of two blocks of 12 Storey Student Hostels, One 12 Storey Staff Quarters Block & One 3 Storey Administration Block for Hwa Chong International School at 673 Bukit Timah Road. The project included an erection of 1,200 tons of structural steelwork.
Gul Road
Project consists of supply, fabrication and erection of movable shelter At 50 Gul Road, The project included a total of 152 tons of structural steel.
Tanjong Kling Road
Project included of Erection of Single Storey Shed (Pipeshop) To Existing Jurong Shipyard At Tanjong Kling Road, The project consists 215 tons of steelwork.
Penjuru Road
Project included of Erection of Single Storey Factory Consisting of Production Mezzanine Floor & 4 – Storey Ancillary Office Block at Penjuru Road. The project consists 1246 tons of steelwork.
Tuas South Boulevard
Project consists erection of a single storey workshop to the existing shipyard development at Tuas South Boulevard